Power system studies

Studies that answer a connection or design question.

Renex provides targeted power system analysis for C&I solar, BESS and hybrid projects, with assumptions, scenarios and engineering conclusions tied back to the project decision.

STUDY MODELSCENARIO / RESULT
LIMITCASE
AssumptionsScenariosResultsAction

Study capability

Analysis with a defined purpose and usable conclusion.

A study is valuable when the model, scenarios and acceptance criteria are clear — and when the result leads to a project action rather than sitting as a standalone report.

01

Fault level studies

Assess prospective fault duties and the implications for equipment ratings, protection and connection design.

02

Protection & coordination

Review protection settings and coordination requirements to support safe, selective and network-compliant operation.

03

Load flow & voltage assessment

Evaluate operating scenarios, power flow and voltage behaviour where the project or network review requires it.

04

Arc flash reporting

Prepare arc flash assessments and reporting when included in the project study scope.

05

Power quality review

Support interpretation of power quality requirements or measurements where they form part of connection, commissioning or technical troubleshooting.

Study structure

Make the engineering logic traceable.

A strong report should make it possible for a reviewer to understand what was modelled, why each case was run, what limits were applied and what the result means for the project.

A

Assumptions & inputs

Network data, site configuration, equipment information, operating modes and any constraints or limitations affecting the model.

S

Scenarios & criteria

Defined cases and the technical criteria used to assess each scenario, rather than unexplained model outputs.

R

Results & actions

Engineering conclusions, identified constraints and recommended design or connection actions presented in a usable form.

Relevant project experience

Study work connected to real C&I delivery scopes.

Prior professional project experience brought into Renex includes fault level and protection coordination studies as part of 800 kW and 350 kW solar + BESS hybrid projects.

View experience detail

Study → design → connection

The most useful outcome is not the report itself. It is a study conclusion that can be carried into protection settings, equipment decisions, DNSP responses and controlled design documentation.

Have a protection, fault, voltage or network-study question on a live project?

Define the study scope